Well mainly the fact that it hasn't happened yet, but coupled specifically with the recent information that from John that he does not consider it practical to get anyone to manufacture the detox or the Mdac2.
Adam,
Just got back to the computer after unpacking and test the SMD reflow oven to read this! - wow thanks a lot!
Partially correct, I now dont see it practical to manufacture 100 pcs each say of the MDAC2 / Detox electronics in China because of the time and effort required + direct impact on unit cost.
Chassis (metal work etc) Packaging, PSU. and component sourcing will still be via China z(already arranged with parts / vendors approved etc.) - but until order Qtys justify the "aggravation" of China production we will manufacture the small Qtys. of PFM units here in my Lab.
Once the initial PFM units are shipped, we will see if theres any interest, but we have to reach ATLEAST 300 pcs. to justify China production. But, if there where to be mass production China batch I'd have first hand experience of any issues during the PFM units' build.
Manufacturing any further units here on our "low rate" SMD line is not feasible as I'm building the PFM units for "Free" in that I dont make any money, the real cost of time and effort on our low rate SMD line would make the Detox too expensive - I'd need to find an SMD production engineer (I'm too costly to be operating an SMD line), and good luck with that here!.
As soon as the SMT Pick and Place machine is ordered and the delivery date confirmed, I will open the initial "At Cost" payment for the Detox to purchase the required items from China - in a perfect world these would arrive in Europe just as we have the SMD P&P machine building boards. I recently purchased a small Reflow oven (bigger then I expected) and hand stencil printer.
Funding arranged for the Pick and Place machine, I'm now in discussions with the manufacturer on what feeders and options we need - final quote then the PO will be raised.
As soon as we are ready to go - lets see just how many people will forward the first "At Cost" Detox payment.... I'd be happy if 50% commit to the next stage...
MDAC2 will follow the Detox, but the design is still not completed.
Now, to pack and ship Michaels units...